01 / THEATRE OPERATIONS
The right items.
Prepared around the procedure.
Kitting and carting connects the planned theatre list with the supplies needed to support it. The aim is a more organised preparation and delivery process, with clear responsibility for each handover.
KITTING
Group the agreed items.
Consumables and disposable supplies are picked and checked against agreed procedure requirements. The clinical team’s approved requirements provide the starting point.
CARTING
Bring the kit to theatre.
The supplies are organised onto case carts and delivered when needed, coordinated with the operating list and instrument availability.
Four connected steps
01
Agree
Confirm the list, requirements and any changes.
02
Prepare
Pick and check the agreed supplies.
03
Deliver
Coordinate the cart and the theatre handover.
04
Review
Record exceptions and replenish for the next list.
What makes it work: accurate requirements, timely updates, clear handovers and a process for exceptions. The detailed workflow is agreed with the hospital and its clinical, logistics and sterile services teams.
Digital inventory tools can support visibility of stock levels, locations and expiry dates. That information helps the operational team manage supplies alongside the agreed workflow.
Further reading: NHS Scan4Safety — Inventory Management.
02 / PROCUREMENT
A saving needs a baseline.
And evidence it happened.
A negotiated price is one part of the picture. A useful savings report shows the starting point, what changed and the benefit realised after the cost of delivering it.
01
Set the baseline
Agree the products or services, prices, volumes, period and scope being compared.
02
Classify the benefit
Distinguish cash-releasing savings, avoided cost and capacity released.
03
Track actual delivery
Use purchasing and finance evidence to separate forecast opportunities from realised results.
04
Confirm the net impact
Account for the agreed costs of the change and avoid counting the same benefit twice.
A SIMPLE CHECK
Gross benefit − costs to deliver = net benefit
Use comparable scope and an agreed measurement period. The resulting benefit is not automatically a cash-releasing saving.
NHS England’s value and savings methodology distinguishes cashable savings from non-cashable benefits and cost avoidance. Released staff time, for example, can increase capacity without directly reducing expenditure.
Questions for the review: Was the saving forecast or realised? Did the volume or specification change? Who has validated it? Are implementation and ongoing costs included?
Further reading: NHS England — Value and savings methodology.
Further reading: HM Treasury — The Government Efficiency Framework.
03 / MANAGED SERVICES
Visibility becomes valuable
when someone owns the next action.
A performance dashboard is a starting point. Effective service management connects each measure to a target, an owner, an escalation route and an agreed response.
01
Delivery
Was the agreed service delivered, and which exceptions need attention?
02
Stock
What is available, what needs replenishing and where are the risks?
03
Cost
How does actual spend compare with the agreed plan and baseline?
04
Suppliers
Which obligations, service issues and key dates require action?
THE REVIEW CYCLE
Measure. Review. Assign. Resolve.
Use the review to make decisions. Record the action, its owner and due date, then check the evidence of completion at the next review.
Keep the measures meaningful: agree the definition, data source and reporting frequency for each KPI. Review trends and exceptions together so that a single headline number does not hide an operational issue.
Contract management tools can bring agreements, owners, milestones, renewal dates and performance information into one place. The operating model determines who uses that information and how issues are resolved.
Further reading: Elcom — Contract management.